Wadsworth and Morrison Road Lakewood, in conjunction with the Colorado Department of Transportation, is starting a $7 million project to improve safety, accessibility and park access at the intersection of Wadsworth Boulevard and Morrison Road.
Traffic Signal Replacements Signal replacement at the intersection of W. 8th Avenue and Simms Street.
Calahan & Quay Storm Sewer Installation Groundwater along W. Calahan Avenue has been flowing across sidewalks and into the curb and gutter between S. Upham Street and S. Pierce Street. The city has designed a storm sewer system to redirect this water away from the street. The work is intended to reduce recurring maintenance needs and icing conditions that can make neighborhood sidewalks and streets difficult to use.
North Dry Gulch Flood Control Construction Phase 3 (Pierce to Teller) The City of Lakewood, Mile High Flood District, American West Construction and Muller Engineering are working together to address recurring flooding along West Colfax Avenue. A new storm sewer system is intended to remove businesses and homes along the North Dry Gulch corridor from the existing floodplain and reduce flood risk to the community and public infrastructure.
W. Colfax Safety Project Phase 1 (Teller to Sheridan) To efficiently construct the project, a two phased approach for project design completion and construction is being implemented. Phase 1 includes construction of the W. Colfax Ave. medians and associated elements. Phase 2 includes construction of the curbside and street edge treatment.
W. 20th Ave. at Nelson Sidewalk Installation & Drainage Upgrades The W. 20th Avenue Stormwater and Sidewalk Project adds sidewalk, curb and gutter, drainage inlets and storm sewer pipes on the south side of W. 20th Avenue from Quail Street Park to Nelson Street. Replacing the existing roadside ditches and cross culverts with storm sewer allows a continuous sidewalk connection from Simms Street to Kipling Street.
RTD W. Line Bridge at 6th Ave. Uplighting Installation This project installs new projection lighting at all four corners of the RTD W Line bridge over 6th Avenue. The work replaces the existing bridge-lighting equipment. The source describes a lighting upgrade and does not identify additional bridge construction as part of this project.
Sanderson Gulch (Jewell Park to Allison) Bank & Channel Stabilization Slopes along Sanderson Gulch north of W. Jewell Avenue are deteriorating. This project will stabilize the side slopes and install drop structures in the gulch between Estes Street and Allison Street. These structures help manage changes in channel elevation and water flow. Guardrails will also be installed along the north side of Jewell Avenue, adjacent to the gulch.